Battery Runtime & Charging Planner
Three questions a fleet buyer has to answer before ordering: what the published runtime actually means in watts, how many boats cover an operating day, and how many chargers turn the fleet over overnight.
A runtime number on a spec sheet is the least informative figure on it. The same pack is quoted as 45 minutes by one supplier and 3 hours by another, and both are honest — because one is measuring full throttle and the other is measuring a drift, and nobody printed the test condition.
This planner does the conversion we recommend in our motor and payload guide: runtime is usable battery energy divided by average power draw, so a runtime claim can be turned back into the wattage it assumes. Where a model does not publish its pack voltage, the energy cannot be derived and we say so — that is the same "100 Ah at what voltage?" question we tell every buyer to ask.
Everything here is a planning estimate built on published figures, not a measurement and not a promise. Where a number a fleet depends on has not been published, it is listed as a gap and turned into a line on the request-for-quotation list below.
Runtime and charging planner
Three parts, each built on published figures only. Nothing here assumes a figure we have not published.
What the published runtime means in watts
A published runtime is a claim about energy and power at the same time. Divide the published pack energy by the published runtime and you get the average power draw the claim assumes.
- Published runtime
- 40–50 min
- As published in the spec sheet
- Published pack energy
- Pack voltage not published
- As published in the spec sheet
- Implied average power draw
- —
- Calculated from the published figures
- Share of peak motor power
- —
- Peak motor power: 13 kW
Average draw cannot be computed for this model
This model publishes amp-hours but not the pack voltage, so the energy cannot be derived and the average power draw cannot be calculated. It is the same gap our motor and payload guide describes: when a supplier quotes only "100 Ah", the follow-up question is at what voltage.
Ask the supplier for the pack voltage and the pack energy in kWh, in writing.
Test conditions
Not published for this model. Our own brand rule is that a runtime figure states its test condition — average speed, payload, water temperature and the state of charge at the start and end of the run — and this model does not publish one, so the draw above is a reading of the claim, not of a measured run.
Boats needed to cover the operating day
If the fleet only charges overnight, every boat has to cover the whole opening day on one charge. Divide the day by the published runtime and you get the floor.
10–12 boats
One charge per boat per night, no mid-day swap.- Guests per hour at that fleet size
- 72
- At the upper end of the fleet range above
This is a floor calculated from the published runtime range, not a capacity guarantee. With a mid-day pack swap the same fleet covers more, which is what the charger plan below is for.
Electricity is the cheap part: a full charge of a common 72V/40Ah-class system costs well under a dollar. The constraint on a battery fleet is time, not money.
Charger count and overnight turnaround
Chargers and the closed window decide whether the fleet comes back tomorrow morning.
5 chargers
Our published planning baseline is at least one charger per two boats.- Time to turn the fleet over
- —
- From your charge time and the 1:2 baseline
- Closed window
- 16.0 h
- From your operating hours
- Planner output
- —
- Time between closing and opening. If the fleet cannot be turned over in that window, the answer is spare packs in rotation or more chargers, not faster charging.
Above roughly eight boats, our published maintenance guidance is to plan pack rotation rather than rely on a single charge cycle.
Each charger handles its share of the fleet in turn, so a full turnaround takes the number of rounds per charger multiplied by the charge time.
Charging electricity is a rounding error: our published guidance notes that a full charge of a common 72V/40Ah-class system costs well under a dollar at commercial rates. What a full fleet charge actually costs you depends on the pack energy on each boat, which scales the figure — it is one of the numbers we put in the quotation rather than assume.
A planning estimate built on published figures, not a measurement and not a promise. It does not include a measured charge curve, a measured runtime, or the effect of water temperature and salt on pack life.
The method, in one line
Runtime ≈ usable battery energy ÷ average power draw. Run it the other way and a runtime claim becomes a wattage: a 5.5 kWh pack quoted at 45 minutes implies roughly 7.3 kW of average draw, while an 11.2 kWh pack quoted at 3 hours implies about 3.7 kW. Same category of boat, twice the assumed pace — which is why the number on a spec sheet is meaningless without the condition attached to it.
Published in our motor power and payload guide and our performance data article. We use the same conversion in the open because it is the conversion we ask every supplier to make.
What has not been published
Every figure on this page carries an evidence level, and these are the ones that are missing. None of them is filled in with an estimate.
- No model in the range publishes a measured runtime under a stated test condition. Every runtime on this page is a published claim, and the claim does not state the speed, payload, water temperature or the state of charge at the start and end.
- Seven of the eleven models publish amp-hours without a pack voltage, so their energy cannot be derived and their average draw cannot be calculated. The four that do publish energy are the only four this planner can normalise.
- Charge time is not published as a general claim for the range. The figure comes from the factory or the supplier for the configuration you are buying, which is why the planner asks you for it instead of guessing it.
- Cycle life at rental duty is not published. A pack quoted at 800 cycles is a figure for a test regime, and a fleet that runs two shifts a day ages its packs differently.
- No public source quantifies how much salt spray shortens pack life. We are not going to put a percentage on it.
We publish configuration-specific battery numbers with the test basis stated in the quotation. That is a deliberate choice rather than an omission: a number without its condition is the thing this industry keeps getting wrong.
The battery data to demand in writing
Our published position is that sustained cruise draw, cycle life at rental duty, charge time at your fleet voltage and the salt-spray hours of the coating system all belong in your request for quotation. This is the list, in the order we would send it. Ask any supplier for the same, and compare the answers.
Pack voltage
Amp-hours alone cannot be turned into energy. "100 Ah" is 1.2 kWh at 12 V and 7.2 kWh at 72 V, so without the voltage the runtime cannot be checked.
Usable pack energy in kWh, and the state-of-charge floor it is measured against
Energy ÷ average draw is the whole runtime calculation. We retire packs at roughly 15–20% rather than running them empty, so the usable figure is the one that matters.
Sustained average power draw at your operating speed, not peak motor power
Peak power is a headline number. The average draw over a session is what decides the runtime, and it is the figure almost nobody publishes.
Charge time at your fleet voltage, from empty to full
Our published planning baseline is one charger per two boats, and a full fleet turnaround only works if the charge time fits the closed window. That arithmetic needs this number.
Cycle life measured at rental duty, with the duty cycle stated
A pack that ages visibly faster in a two-shift operation is a replacement cost you have to budget, and a bench figure does not describe it.
Pack weight
It decides how many packs one person can swap in a session and how much of the hull payload the battery takes.
Salt-spray hours for the coating and enclosure system
We do not publish a salt-water endurance figure for any model, and we are not going to invent one. Ask the supplier for a tested figure or a written warranty boundary.
The test conditions behind the published runtime
Average speed, payload, water temperature, and the state of charge at the start and end of the run. Without these, a runtime figure cannot be compared with another one.
Related tools
The eight tools answer eight different buying questions. Most fleet projects need more than one of them before a quote is worth asking for.
Kart Boat Spec & Voltage Chart
Every active electric kart boat in the range on one page: battery voltage and energy, motor power, top speed, runtime, rated seats and hull size — read straight from the current spec sheets.
Table + calculatorPayload & Capacity Guide
Rated seats, hull weight and published maximum payload for each model, with a calculator that checks a full boat against the published limit before you order a fleet.
Market lookupCertification & Licensing Lookup
What each market actually requires before a kart boat can be sold, registered or operated: hull approval, electrical and battery rules, operator licensing, and where the lead time bites.
CalculatorFleet ROI Calculator
Revenue, operating cost and payback for a rental fleet, with conservative, neutral and optimistic presets and every assumption exposed.
CalculatorPool & Venue Sizing Calculator
How deep and how large a pool has to be for a given fleet, with the safe spacing and lane widths that make a circuit work.
SelectorBoat Type Selector
Answer a few questions about your water, your riders and your charging setup, and get a shortlist with the reasoning behind it.
EstimatorContainer Loading & Landed-Cost Estimator
How many boats fit in a 20 ft container and what a fleet costs landed — with the HS classification question left open, because it is not settled.
From calculation to RFQ
Every tool here ends the same way: the numbers you worked out go into the enquiry form with your message, so the first reply quotes against your configuration instead of a generic range.
Start an enquiry with these numbersReady to price a fleet?
Tell us the market, the number of boats and the site. We reply with a configuration and a landed-cost estimate, not a brochure.